Official websites use .mil
Secure .mil websites use HTTPS
Illinois
LRL-2019-288 LRL-2018-602 LRL-2018-156 Amended LRL-2018-156 LRL-2017-108 LRL-2017-812 LRL-2017-812 LRL-2006-635 LRL-1961-14-C LRL-2013-907 LRL-2014-5-2 LRL-2011-3
LRL-2011-6
LRL-2012-5-2
LRL-2012-5-3
LRL-2012-5-4
LRL-2013-5-1
Ohio
LRL-2018-642 2016-03-LRD LRL-2014-5-2 LRL-2012-5-4
LRL-2011-3
LRL-2018-988 LRL-2018-1087 LRL-2018-00988 LRL-2019-454 LRL-2018-107 LRL-2016-481 LRL-2015-65 LRL-2018-00071 LRL-2018-446 LRL-1998-01842 LRL-2016-481 LRL-2002-521 LRL-2016-46 LRL-2018-75 LRL-2018-74 LRL-2018-72 LRL-2018-70 LRL-2018-831 LRH-2018-00738 LRL-2018-785 LRL-2018-784 LRL-2018-00073 LRL-2018-00461 LRL-2014-100 LRL-2017-00798 LRL-2017-660 LRL-2017-00028 LRL-2017-632 LRL-2014-408 LRL-2017-1190 LRL-2010-683 LRL-2017-54 LRL-2014-408 LRL-2017-292 LRL-2017-00092 LRL-2017-418
LRL-2013-444b LRL-2015-59 LRL-1976-10045 LRL-2016-00272 LRL-2012-45 LRL-2016-00006 LRL-2016-46 LRL-2016-00006 LRL-2014-798 LRL-2004-324 | LRL-2015-578 LRL-2015-400 LRL-2009-1210-c LRL-2011-6 LRL-2014-648
LRL-2019-930 LRL-1999-289 LRL-2012-24 LRL-2019-444 LRL-2019-835 LRL-2019-404 LRL-2019-444 LRL-2019-282 LRL-2019-764 LRL-2019-749 LRL-2019-752 LRL-2019-769 LRL-2019-513 LRL-2019-496 LRL-1981-65 LRL-2019-328 LRL-2016-1036 (2) LRL-2013-84 LRL-2019-68 LRL-2013-00085 LRL-2018-1040 Extension LRL-2018-1040
LRL-2014-00209 LRL-2018-1102 LRL-1999-289 LRL-2018-632 LRL-2017-724
LRL-2018-691 LRL-2003-1473 LRL-2018-265 LRL-2018-642 LRL-2016-853 LRL-2014-859 LRL-2018-465 LRL-2017-104 LRL-2012-24 LRL-2010-325 LRL-2013-86 LRL-2018-246 LRL-2018-43 LRL-2018-321 LRL-2018-294 LRL-2016-1083 LRL-2017-899 LRL-1962-17 LRL-2017-879 LRL-2017-19 LRL-2014-00500 LRL-1981-90070 LRL-2017-612 LRL-2016-00148 LRL-1976-13 LRL-2017-292 LRL-2006-635 LRL-2017-496 LRL-2017-565 LRL-2017-724 LRL-2017-768 LRL-2017-104 LRL-2017-708 LRL-2013-00143 LRL-1976-10045 LRL-1993-1023 LRL-2017-365 LRL-2015-329 LRL-2017-269 LRL-2017-273 LRL-2017-274 LRL-2016-00006 LRL-2013-00091
LRL-2012-646 LRL-2010-325 LRL-2016-808 LRL-2016-00006 LRL-2005-197 LRL-2015-868 LRL-2015-558-2 LRL-2014-374 LRL-1981-00042 LRL-2004-1506 LRL-2015-785 LRL-2009-358 LRL-2015-684 LRL-2015-225 LRL-2008-642 LRL-2013-83 LRL-2015-645 LRL-2014-664 LRL-2015-558 LRL-2009-127 LRL-2015-282 LRL-2015-417 LRL-2011-707-b LRL-2014-665 LRL-2013-448 LRL-2014-617 LRL-2014-346 LRL-2013-272 LRL-2015-21 LRL-2014-927 LRL-2013-533 LRL-2014-5-2 LRL-2013-739 LRL-2010-323 LRL-2011-3 LRL-2011-6 LRL-2012-5 LRL-2012-5-3 LRL-2012-5-4
PUBLIC NOTICE FOR FEDERAL REGISTER NOTICE
ANNOUNCING THE REISSUANCE OF THE NATIONWIDE PERMITS
On January 13, 2021, the U.S. Army Corps of Engineers (Corps) published a final rule in the Federal Register (86 FR 2744) announcing the reissuance of 12 existing nationwide permits (NWPs) and four new NWPs, as well as the reissuance of NWP general conditions and definitions with some modifications. These 16 NWPs will go into effect on March 15, 2021, and will expire on March 14, 2026:
The Corps has also issued final decision documents for the new and reissued
NWPs. These final decision documents are available at www.regulations.gov at docket number COE-2020-0002. Furthermore, the national NWP decision documents will be supplemented by Division Engineers to address decisions concerning the addition of regional conditions to the NWPs.
The 12 existing NWPs published in the January 13, 2021 final rule replace the 2017 versions of these NWPs. The 2017 versions of NWPs 12, 21, 29, 39, 40, 42, 43, 44, 48, 50, 51, and 52 expire on March 14, 2021.
With the publication of this Federal Register notice, Corps divisions will begin finalizing regional conditions for these 16 NWPs. Regional conditions will provide additional protection for the aquatic environment, and will help ensure that the NWPs authorize only those activities with no more than minimal adverse environmental effects. Regional conditions will help ensure protection of high value waters within the Commonwealth of Kentucky.
Corps divisions and districts will also begin determining which conditions for water quality certifications issued by states, tribes, and EPA for the issuance of these NWPs become conditions of these NWPs. Corps divisions and districts will also begin determining which conditions for Coastal Zone Management Act consistency concurrences issued by states for the issuance of these NWPs become conditions of these NWPs. Those regional conditions will be announced in a future public notice issued by the Louisville District.
There are 40 existing NWPs that were not reissued or modified by the January 13, 2021 final rule. Those 40 NWPs were published in the January 6, 2017, issue of the Federal Register (82 FR 1860) and those NWPs remain in effect until the Corps issues a final rule reissuing those NWPs or March 18, 2022, whichever comes first. The 40 2017 NWPs that remain in effect are:
The regional conditions for these 40 NWPs that were approved by division engineers in 2017 remain in effect while these 2017 NWPs remain in effect.
The January 13, 2021, Federal Register notice is available for viewing at https://www.federalregister.gov/documents/2021/01/13/2021-00102/reissuance-and-modification-of-nationwide-permits
As an alternative, interested parties can access the January 13, 2021, final rule and related documents at: https://www.usace.army.mil/Missions/Civil-Works/Regulatory-Program-and-Permits/Nationwide-Permits/
Index of 2021 Nationwide Permits, Conditions, District Engineer’s Decision, Further Information, and Definitions
Nationwide Permits
12. Oil or Natural Gas Pipeline Activities
21. Surface Coal Mining Activities
29. Residential Developments
39. Commercial and Institutional Developments
40. Agricultural Activities
42. Recreational Facilities
43. Stormwater Management Facilities
44. Mining Activities
48. Commercial Shellfish Mariculture Activities
50. Underground Coal Mining Activities
51. Land-Based Renewable Energy Generation Facilities
52. Water-Based Renewable Energy Generation Pilot Projects
55. Seaweed Mariculture Activities
56. Finfish Mariculture Activities
57. Electric Utility Line and Telecommunications Activities
58. Utility Line Activities for Water and Other Substances
General Conditions
1. Navigation
2. Aquatic Life Movements
3. Spawning Areas
4. Migratory Bird Breeding Areas
5. Shellfish Beds
6. Suitable Material
7. Water Supply Intakes
8. Adverse Effects from Impoundments
9. Management of Water Flows
10. Fills Within 100-Year Floodplains
11. Equipment
12. Soil Erosion and Sediment Controls
13. Removal of Temporary Fills
14. Proper Maintenance
15. Single and Complete Project
16. Wild and Scenic Rivers
17. Tribal Rights
18. Endangered Species
19. Migratory Birds and Bald and Golden Eagles
20. Historic Properties
21. Discovery of Previously Unknown Remains and Artifacts
22. Designated Critical Resource Waters
23. Mitigation
24. Safety of Impoundment Structures
25. Water Quality
26. Coastal Zone Management
27. Regional and Case-by-Case Conditions
28. Use of Multiple Nationwide Permits
29. Transfer of Nationwide Permit Verifications
30. Compliance Certification
31. Activities Affecting Structures or Works Built by the United States
32. Pre-Construction Notification
District Engineer’s Decision
Further Information
Definitions
Best management practices (BMPs)
Compensatory mitigation
Currently serviceable
Direct effects
Discharge
Ecological reference
Enhancement
Establishment (creation)
High Tide Line
Historic property
Independent utility
Indirect effects
Loss of waters of the United States
Navigable waters
Non-tidal wetland
Open water
Ordinary high water mark
Perennial stream
Practicable
Pre-construction notification
Preservation
Re-establishment
Rehabilitation
Restoration
Riffle and pool complex
Riparian areas
Shellfish seeding
Single and complete linear project
Single and complete non-linear project
Stormwater management
Stormwater management facilities
Stream bed
Stream channelization
Structure
Tidal wetland
Tribal lands
Tribal rights
Vegetated shallows
Waterbody
Index of 2017 Nationwide Permits, Conditions, District Engineer’s Decision, Further Information, and Definitions That Remain in Effect Under the January 6, 2017, Final Rule (82 FR 1860)
1. Aids to Navigation
2. Structures in Artificial Canals
3. Maintenance
4. Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities
5. Scientific Measurement Devices
6. Survey Activities
7. Outfall Structures and Associated Intake Structures
8. Oil and Gas Structures on the Outer Continental Shelf
9. Structures in Fleeting and Anchorage Areas
10. Mooring Buoys
11. Temporary Recreational Structures
13. Bank Stabilization
14. Linear Transportation Projects
15. U.S. Coast Guard Approved Bridges
16. Return Water From Upland Contained Disposal Areas
17. Hydropower Projects
18. Minor Discharges
19. Minor Dredging
20. Response Operations for Oil or Hazardous Substances
22. Removal of Vessels
23. Approved Categorical Exclusions
24. Indian Tribe or State Administered Section 404 Programs
25. Structural Discharges
26. [Reserved]
27. Aquatic Habitat Restoration, Establishment, and Enhancement Activities
28. Modifications of Existing Marinas
30. Moist Soil Management for Wildlife
31. Maintenance of Existing Flood Control Facilities
32. Completed Enforcement Actions
33. Temporary Construction, Access, and Dewatering
34. Cranberry Production Activities
35. Maintenance Dredging of Existing Basins
36. Boat Ramps
37. Emergency Watershed Protection and Rehabilitation
38. Cleanup of Hazardous and Toxic Waste
41. Reshaping Existing Drainage Ditches
45. Repair of Uplands Damaged by Discrete Events
46. Discharges in Ditches
47. [Reserved]
49. Coal Remining Activities
53. Removal of Low-Head Dams
54. Living Shorelines
19. Migratory Bird and Bald and Golden Eagle Permits
Ephemeral stream
Intermittent stream
Protected tribal resources