Since the beginning of construction of the Louisville VA Medical Center in December 2021, the site has seen a lot of change and one of the most noticeable early changes was it going from a 35-acre grassy field to much of the earth materials being collected and sorted in large piles on the south side of the property.
What some may think of as waste materials - the expected leftovers from earthwork, isn’t going to waste. In fact, more than 70,000 cubic yards of material have been reused in multiple ways in construction on the site.