Army Reserve Customers

Welcome to the Army Reserve Programs customer page.

Attention Designers: When there are two or more versions of a document below you should use the most current version that was applicable at the time the contract was awarded.


Army Reserve Requirements:

Arms Vault Security Checklist

Army Reserve Design Process & Submittal Requirements Part A (Inception & Project Definition) Apr07

Army Reserve Design Process & Submittal Requirements Part B D-B-B April 2007

Army Reserve Design Process & Submittal Requirements Part C D-B April 2007

Army Reserve Design/Build RFP Instruction Manual - February 2020

Army Reserve Design/Build RFP Specifications (Word Files) 2020

Army Reserve Enterprise Building Control System (EBCS) Technical Design Guide July 2020

Army Reserve Enterprise Building Control Systems (EBCS) Technical Design Guide and Attachments – Dec 2021

ARNEC Infrastructure Change 3 - Addendum - Telecom Outlet Table - May 2022

ARNEC Infrastructure Change 3 - Addendum - Telecom Outlet Table - July 2020

ARNEC Infrastructure Technical Criteria Change 3 - Feb 2020

ARNEC 48 Series Telecommunications Specifications 2020

ARNEC Sample Test Plan - Spec 27 10 00.00 48 - Dated April 2022 (docx)

ARNEX Sample Test Plan - Spec 27 10 00.00 48 - Dated April 2022 (PDF)

ARNEC Sample Test Plan - Spec Section 33 82 00.00 48 - Dated April 2022 (docx)

ARNEC Sample Test Plan - Spec Section 33 82 00.00 48 - Dated April 2022 (PDF)

Bi Level Loading Ramp Details - January 2023
A-110.pdf
S-110.pdf
S-301.pdf

Caging Details Revised 31 July 2023

DRAFT: Army Reserve Design Guide - DA PAM - August 2020 - Superseded October 2023

Army Reserve Design Guide - October 2023

IDS Requirements - Ft McCoy - ELK System - Dated February 2023

Kitchen Drawings and Details - Aug 2020

Memo to PPMD for ATFP

Minuteman Plaque Details

OMAR Project Funding Requirements

Warranty Implementation Plan


Corps / Louisville District Requirements:

A/E/C CADD Standards

Additional Resources: Geotechnical Requirements for Design Build Solicitation 03-08 (Current Version)

BCOE and RTA Requirements for A-E Designs

BCOE and RTA Requirements for In-House Designs

Design Build Checklist

Geotechnical Requirements for full P&S Solicitation package preparation for Internet 04-07

Louisville District (LRL) and Army Reserve (AR) Specifications

Project Design Review / Comment Resolution System - Dr. Checks (PROJNET Access Password Required)

Standard Fence Drawings
 


 Department of Army / DoD Requirements:

ABA Accessibility Standards for Federal Facilities

Engineering and Construction Bulletins

I3A: Technical Guide for Installation Information Infrastructure Architecture (Feb 2010)

OACSIM LID Guidance Memo 2017


 Louisville District Requirements:

Engineering Considerations and Instructions for Field Personnel (includes form)

LRL ATFP Standards Review Checklist
 


 Other:

Whole Building Design Guide

 

Army Reserve