Official websites use .mil
Secure .mil websites use HTTPS
Welcome to the Army Reserve Programs customer page.
Attention Designers: When there are two or more versions of a document below you should use the most current version that was applicable at the time the contract was awarded.
Army Reserve Requirements: Arms Vault Security Checklist Army Reserve Design Process & Submittal Requirements Part A (Inception & Project Definition) Apr07 Army Reserve Design Process & Submittal Requirements Part B D-B-B April 2007 Army Reserve Design Process & Submittal Requirements Part C D-B April 2007 Army Reserve Design/Build RFP Instruction Manual - February 2020
Army Reserve Design/Build RFP Specifications (Word Files) 2020
Army Reserve Enterprise Building Control System (EBCS) Technical Design Guide July 2020
Army Reserve Enterprise Building Control Systems (EBCS) Technical Design Guide and Attachments – Dec 2021
ARNEC Infrastructure Change 3 - Addendum - Telecom Outlet Table - May 2022
ARNEC Infrastructure Change 3 - Addendum - Telecom Outlet Table - July 2020
ARNEC Infrastructure Technical Criteria Change 3 - Feb 2020
ARNEC 48 Series Telecommunications Specifications 2020
ARNEC Sample Test Plan - Spec 27 10 00.00 48 - Dated April 2022 (docx)
ARNEX Sample Test Plan - Spec 27 10 00.00 48 - Dated April 2022 (PDF)
ARNEC Sample Test Plan - Spec Section 33 82 00.00 48 - Dated April 2022 (docx)
ARNEC Sample Test Plan - Spec Section 33 82 00.00 48 - Dated April 2022 (PDF)
Bi Level Loading Ramp Details - January 2023 A-110.pdf S-110.pdf S-301.pdf
Caging Details Revised 31 July 2023
DRAFT: Army Reserve Design Guide - DA PAM - August 2020 - Superseded October 2023
Army Reserve Design Guide - October 2023
IDS Requirements - Ft McCoy - ELK System - Dated February 2023
Kitchen Drawings and Details - Aug 2020
Memo to PPMD for ATFP Minuteman Plaque Details OMAR Project Funding Requirements Warranty Implementation Plan
Corps / Louisville District Requirements: A/E/C CADD Standards Additional Resources: Geotechnical Requirements for Design Build Solicitation 03-08 (Current Version) BCOE and RTA Requirements for A-E Designs BCOE and RTA Requirements for In-House Designs
Design Build Checklist Geotechnical Requirements for full P&S Solicitation package preparation for Internet 04-07 Louisville District (LRL) and Army Reserve (AR) Specifications Project Design Review / Comment Resolution System - Dr. Checks (PROJNET Access Password Required) Standard Fence Drawings
Department of Army / DoD Requirements: ABA Accessibility Standards for Federal Facilities Engineering and Construction Bulletins
I3A: Technical Guide for Installation Information Infrastructure Architecture (Feb 2010)
OACSIM LID Guidance Memo 2017
Louisville District Requirements: Engineering Considerations and Instructions for Field Personnel (includes form) LRL ATFP Standards Review Checklist
Other:
Whole Building Design Guide