ImageGallery

Corps consults with City of Cincinnati on repair process after flood event
Pictured is a segment of the precast concrete arch culvert the Corps constructed as part of the flood risk management project in Cincinnati. The joints between the sections have separated and the alignment has shifted. Erosion is also present at right.

Download Image: Full Size (1.72 MB)
Tags:
Photo by: David Lasoski |  VIRIN: 160901-A-CE999-214.JPG

HotInfo

The Louisville District website (lrl.usace.army.mil) is moving to the Great Lakes and Ohio River Division website (lrd.usace.army.mil). This website is scheduled to be decommissioned on July 15, 2024. Please update all saved links to www.lrd.usace.army.mil.