ImageGallery

At the Olmsted Locks and Dam construction project, the cores of the lower pier shells needed to be in-filled with concrete before they would be overtopped by the Ohio River and clogged with silt and debris. (U.S. Army Corps of Engineers photo by Bill Gilmour)
At the Olmsted Locks and Dam construction project, the cores of the lower pier shells needed to be in-filled with concrete before they would be overtopped by the Ohio River and clogged with silt and debris. (U.S. Army Corps of Engineers photo by Bill Gilmour)

Download Image: Full Size (1.2 MB)
Tags:
Photo by: Bill Gilmour |  VIRIN: 121108-A-CE999-020.JPG

HotInfo

The Louisville District website (lrl.usace.army.mil) is moving to the Great Lakes and Ohio River Division website (lrd.usace.army.mil). This website is scheduled to be decommissioned on July 15, 2024. Please update all saved links to www.lrd.usace.army.mil.