ImageGallery

Phase 2 progresses at Canandaigua VA Medical Center
Now that walkways 1-4 have foundations, framing and trusses installed, the next step is to add block and slab pours as well as roofing.

Download Image: Full Size (1.89 MB)
Photo by: Michael Maddox |  VIRIN: 230822-A-GI410-1009.JPG