ImageGallery

LOUVAMC Update
A contractor uses a drill rig to remove soil overburden March 28. The drill rig is also being used to remove bedrock as part of forming drilled piers.

Download Image: Full Size (1.99 MB)
Photo by: Mike Maddox |  VIRIN: 220328-A-GI410-101.JPG