Official websites use .mil
Secure .mil websites use HTTPS
Illinois
LRL-2019-288 LRL-2018-602 LRL-2018-156 Amended LRL-2018-156 LRL-2017-108 LRL-2017-812 LRL-2017-812 LRL-2006-635 LRL-1961-14-C LRL-2013-907 LRL-2014-5-2 LRL-2011-3
LRL-2011-6
LRL-2012-5-2
LRL-2012-5-3
LRL-2012-5-4
LRL-2013-5-1
Ohio
LRL-2018-642 2016-03-LRD LRL-2014-5-2 LRL-2012-5-4
LRL-2011-3
LRL-2018-988 LRL-2018-1087 LRL-2018-00988 LRL-2019-454 LRL-2018-107 LRL-2016-481 LRL-2015-65 LRL-2018-00071 LRL-2018-446 LRL-1998-01842 LRL-2016-481 LRL-2002-521 LRL-2016-46 LRL-2018-75 LRL-2018-74 LRL-2018-72 LRL-2018-70 LRL-2018-831 LRH-2018-00738 LRL-2018-785 LRL-2018-784 LRL-2018-00073 LRL-2018-00461 LRL-2014-100 LRL-2017-00798 LRL-2017-660 LRL-2017-00028 LRL-2017-632 LRL-2014-408 LRL-2017-1190 LRL-2010-683 LRL-2017-54 LRL-2014-408 LRL-2017-292 LRL-2017-00092 LRL-2017-418
LRL-2013-444b LRL-2015-59 LRL-1976-10045 LRL-2016-00272 LRL-2012-45 LRL-2016-00006 LRL-2016-46 LRL-2016-00006 LRL-2014-798 LRL-2004-324 | LRL-2015-578 LRL-2015-400 LRL-2009-1210-c LRL-2011-6 LRL-2014-648
LRL-2019-930 LRL-1999-289 LRL-2012-24 LRL-2019-444 LRL-2019-835 LRL-2019-404 LRL-2019-444 LRL-2019-282 LRL-2019-764 LRL-2019-749 LRL-2019-752 LRL-2019-769 LRL-2019-513 LRL-2019-496 LRL-1981-65 LRL-2019-328 LRL-2016-1036 (2) LRL-2013-84 LRL-2019-68 LRL-2013-00085 LRL-2018-1040 Extension LRL-2018-1040
LRL-2014-00209 LRL-2018-1102 LRL-1999-289 LRL-2018-632 LRL-2017-724
LRL-2018-691 LRL-2003-1473 LRL-2018-265 LRL-2018-642 LRL-2016-853 LRL-2014-859 LRL-2018-465 LRL-2017-104 LRL-2012-24 LRL-2010-325 LRL-2013-86 LRL-2018-246 LRL-2018-43 LRL-2018-321 LRL-2018-294 LRL-2016-1083 LRL-2017-899 LRL-1962-17 LRL-2017-879 LRL-2017-19 LRL-2014-00500 LRL-1981-90070 LRL-2017-612 LRL-2016-00148 LRL-1976-13 LRL-2017-292 LRL-2006-635 LRL-2017-496 LRL-2017-565 LRL-2017-724 LRL-2017-768 LRL-2017-104 LRL-2017-708 LRL-2013-00143 LRL-1976-10045 LRL-1993-1023 LRL-2017-365 LRL-2015-329 LRL-2017-269 LRL-2017-273 LRL-2017-274 LRL-2016-00006 LRL-2013-00091
LRL-2012-646 LRL-2010-325 LRL-2016-808 LRL-2016-00006 LRL-2005-197 LRL-2015-868 LRL-2015-558-2 LRL-2014-374 LRL-1981-00042 LRL-2004-1506 LRL-2015-785 LRL-2009-358 LRL-2015-684 LRL-2015-225 LRL-2008-642 LRL-2013-83 LRL-2015-645 LRL-2014-664 LRL-2015-558 LRL-2009-127 LRL-2015-282 LRL-2015-417 LRL-2011-707-b LRL-2014-665 LRL-2013-448 LRL-2014-617 LRL-2014-346 LRL-2013-272 LRL-2015-21 LRL-2014-927 LRL-2013-533 LRL-2014-5-2 LRL-2013-739 LRL-2010-323 LRL-2011-3 LRL-2011-6 LRL-2012-5 LRL-2012-5-3 LRL-2012-5-4
This notice announces an application submitted for a Department of the Army (DA) Permit, subject to Section 404 of the Clean Water Act:
APPLICANT: B & W Resources, Inc.
300 Liperote Way
London, KY 40741
AGENT: Aquatic Resources Management
2554 Palumbo Drive
Lexington, KY 40509
LOCATION: The proposed project would be located just north of Stopover, Kentucky in Pike County along State Highway 194. The project would be limited to unnamed tributaries of Big Branch.
Latitude: 37.05360
Longitude: -82.08470
7.5 Minute Quad: 1:24K Majestic, KY
PURPOSE: The purpose of this proposed project is to allow B&W Resources, Inc. to conduct area and contour mining to efficiently extract coal reserves situated along the Lower Elkhorn and Lower Alma and all seams above 1490’ in elevation as well as contour mine the Lower Elkhorn within the permitted boundary of KDNR #898-1036
DESCRIPTION OF WORK: This proposed project is scheduled to begin upon issuance of all necessary permits and is anticipated to be in operation for approximately 11 ½ years based on 40,000 tons per month for a total of 5,500,000 tons. The project would encompass 1,163 acres of predominantly forestland. The unnamed tributaries located within the proposed permit areas flow into Big Branch of the Tug Fork of the Big Sandy River. The permit boundary is primarily contained on private property with minimal public access. The project would impact 8,878 linear feet of stream within the Big Branch watershed. Three permanent spoil disposal sites and three sediment control structures are proposed as part of this mining project. Impacts to mainstream Big Branch include 1,928 linear feet of perennial stream reach and 1,139 of intermittent stream reach as a result of spoil disposal site and sediment control structure construction. Unnamed tributaries within the Big Branch watershed account for the remaining 5,811 linear feet of combined impacts within intermittent and ephemeral stream segments. These impacts would result from two additional spoil disposal sites and sediment control structures.
AVOIDANCE MINIMIZATION, AND MITIGATION MEASURES:
The applicant has incorporated avoidance, minimization, and mitigation measures into the proposed mining project. Initially, the applicant conducted an alternative analysis to determine the least environmentally damaging practicable alternative. The applicant would also conduct water quality monitoring through the Kentucky Pollution Discharge Elimination System (KPDES) program that would provide avoidance and minimization of adverse effects and would provide remedial actions should any exceedance occur. The spoil disposal sites have been minimized and optimum placement has been determined to minimize impacts to higher quality waters while maintaining the feasibility of the project. The applicant explored the concept of one large spoil disposal site to contain all excess overburden, however the only location large enough to facilitate such a site would impact significantly more high-quality perennial stream. The applicant also explored the concept of constructing nine smaller spoil disposal sites that would be placed in different watersheds, however these smaller spoil disposal sites would impact a larger amount of stream length and would require placement within watersheds with known big sandy crayfish occurrences. Lastly, the applicant has proposed a detailed compensatory mitigation plan to offset unavoidable impacts associated with the three spoil disposal sites and their appurtenant sediment control structures. The plan includes the preservation of high-quality streams within the Big Sandy watershed within one contiguous watershed to be protected in perpetuity via deed restriction.
It is noted that this proposed mitigation plan is open to comment and subject to change. The Corps will make a determination of appropriate mitigation, upon review of all submitted information.
This proposal contains no areas designated as a component of a State and/or Federal Wild and Scenic River System and would not have a direct and adverse effect on these systems.
REVIEW PROCEDURES: A DA Permit cannot be issued if any legally required Federal, State, or local authorization or certification is denied. A DA permit, if otherwise warranted, will not be issued until a State of Kentucky Water Quality Certification or waiver is on file at this office. In order to comply with Section 401 of the Clean Water Act, the applicant must apply for State certification from the Kentucky Energy and Environment Cabinet Division of Water (KDOW).[LPJCUC(2]
Copies of this notice are sent to the appropriate Federal and State Fish and Wildlife Agencies. Their views and comments are solicited in accordance with the Fish and Wildlife Coordination Act of 1956. The Endangered Species Act (ESA, 87 Stat. 884, as amended; 16 U.S.C. 1531 et seq.) requires federal agencies to consult with the U.S. Fish and Wildlife Service (USFWS) pursuant to Section 7(a) 2 of the ESA on all actions that may affect a species listed (or proposed for listing) under the ESA as threatened or endangered, or any designated critical habitat. A copy of this notice is being furnished to the USFWS for their review. Per this notification, we request comments from the USFWS concerning potential impact to threatened and/or endangered species that may occur within the project area. After receipt of comments, the USACE will evaluate the potential impacts to proposed and/or listed species and their designated critical habitat and initiate consultation with USFWS, if required.
Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. A request for a public hearing must state the specific interest which might be damaged by issuance of the DA Permit.
The National Register of Historic Places has been examined, and it has been determined that there are no properties currently listed on the Register which have been directly affected by the work. If we are made aware, as a result of comments received in response to this notice, or by other means, of specific archaeological, scientific, prehistorical, or historical sites or structures which might be affected by the proposed work, the District Engineer will immediately take the appropriate action necessary pursuant to the National Historic Preservation Act of 1966 - Public Law 89-665 as amended (including Public Law 96-515).
The decision whether to issue a permit will be based on an evaluation of the probable impact of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered; among those are conservation, economics, aesthetic values, general environmental concerns, historic values, fish and wildlife values, flood damage prevention, land use, navigation, recreation, water supply, water quality, energy needs, safety, food production, and in general, the needs and welfare of the public. In[pjl3] addition, the evaluation of the impact of the activity on the public interest will include application of the guidelines (40 CFR Part 230) promulgated by the Administrator, United States Environmental Protection Agency, under authority of Section 404(b) of the CWA.
The Corps of Engineers is soliciting comments from the public; Federal, State, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. It is presumed that all interested parties and agencies will wish to respond; therefore, a lack of response will be interpreted as meaning that there is no objection to the proposed project. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Written statements received in this office on or before the closing date will become a part of the official record and will be considered in the determination on this permit request. Any objections which are received during this period will be forwarded to the applicant for possible resolution before the determination is made whether to issue or deny the requested DA Permit. A permit will be granted unless its issuance is found to be contrary to the public interest.
Information pertaining to this application is available for public examination during normal business hours upon prior request. Drawings are available on Louisville District's Internet site at http://www.lrl.usace.army.mil/Missions/Regulatory/Public-Notices/. All comments regarding this proposal should be addressed to Justin Branham, CELRL-RDS at the address noted above and should refer to the Public Notice Number LRL-2021-00826-jlb.
If you desire to submit your comments by email, you must comply with the following:
a) In the subject line of your email, type in ONLY the Public Notice ID No. LRL-2021-00826-jlb.
Example:
Subject: LRL-2021-00826-jlb
b) Provide your physical mailing address and telephone number.
c) Send your email to: lrl.regulatorypubliccomment@usace.army.mil