ImageGallery

Louisville VAMC project reaches “bottoming out” milestone
Rock sockets like these need to be bored out during the pier drilling process to reach the proper depth for maximum strength.

Download Image: Full Size (2.48 MB)
Photo by: Michael Maddox |  VIRIN: 230712-A-GI410-1022.JPG

HotInfo

The Louisville District website (lrl.usace.army.mil) is moving to the Great Lakes and Ohio River Division website (lrd.usace.army.mil). This website is scheduled to be decommissioned on July 15, 2024. Please update all saved links to www.lrd.usace.army.mil.