Results:
Tag: Repairs
Clear
  • Locking temporarily suspended at Markland Locks and Dam

    At approximately 3:00 p.m. today, October 21, 2021, navigation traffic was halted to facilitate a hydraulic cylinder repair on the main (1,200 foot) lock chamber at Markland Locks and Dam (Ohio River Mile 531.5). The closure will last until approximately 12:00 p.m. (EDT) on Saturday, October 23, 2021. Upon completion of the hydraulic cylinder repairs, traffic will resume in the main chamber.
  • Scheduled maintenance underway at McAlpine Locks and Dam

    Due to scheduled maintenance and repairs, the north (1,200 ft.) chamber at McAlpine Locks and Dam on the Ohio River in Louisville, Ky., will be closed from June 15 through November 13, 2020 for miter gate replacement. During this time all traffic will be passed through the south (1,200 ft.) chamber. Starting around June 20, dredging operations of the lower approach will also be conducted. This will include a total river closure during nighttime hours of 6 p.m. to 6 a.m from July 3 through July 7.

News Releases (Hidden - Presorted LRD list)

Results:
Tag: Repairs
Clear
  • Locking temporarily suspended at Markland Locks and Dam

    At approximately 3:00 p.m. today, October 21, 2021, navigation traffic was halted to facilitate a hydraulic cylinder repair on the main (1,200 foot) lock chamber at Markland Locks and Dam (Ohio River Mile 531.5). The closure will last until approximately 12:00 p.m. (EDT) on Saturday, October 23, 2021. Upon completion of the hydraulic cylinder repairs, traffic will resume in the main chamber.