Tremie concrete placement at Olmsted
Following the successful set-down of a navigable pass shell, tremie concrete is poured through the lift frame legs to tie the foundation pilings and shell together, thus making it a permanent feature on the river bottom. The tremie mix is specially designed to withstand the underwater environment encountered on the bottom of the Ohio river while maintaining a consistent flow and strength.