ImageGallery

Olmsted Dam second dam tainter gate
The second tainter gate for the Olmsted Dam construction project is on site as of July and will be prepared for installment later this year. The first tainter gate was installed in the fall of 2014. Work continues on the lower Ohio River on this mega project.

Download Image: Full Size (0.76 MB)
Tags:
Photo by: Mick Awbrey |  VIRIN: 150714-A-CE999-512.JPG